Most histories of injection molding begin in the 1800s and focus on who built the first machine. For anyone buying molded parts today, the half-century since 1976 is more useful. Over that stretch, the industry went from presses run by feel to parts that get simulated and prototyped before any steel is cut. Plenty of ideas passed through molding in those years.

This timeline follows the ones that lasted, and in a few of them H&H Molds was closer to the action than most people would guess. It starts with the chunk of plastic every shot used to leave behind.

Hot Runners and the Plastic Tree Every Shot Left Behind

The 1970s · Hot Runners

As late as 1978, only about 15 percent of new molds used hot runners, even though commercial systems had been on the market since the 1950s and ’60s. Most tools ran cold.

When a cold-runner mold opens at the end of a shot, the parts don’t come out alone. They are attached to a rigid tree of plastic made up of the sprue, which carried melt in from the machine nozzle, the runners that branched out to each cavity, and the gates where the runners met the part. With small parts, the tree could weigh more than all of the parts it had fed.

Resin was only part of what that tree cost. Because the sprue was usually the thickest section of the shot, and often thicker than the part, it was the last thing to freeze. The mold had to stay closed until that piece of scrap cooled enough to eject, and the cycle got longer to accommodate it, even though nobody wanted the sprue. Some of the tree could be ground up and fed back into the hopper as regrind, but the rest was waste, and the customer paid for it in either case.

A hot-runner system uses a heated manifold and nozzles to keep the plastic molten all the way to the gate, so there is no frozen runner to wait on and nothing left to trim off afterward. According to Plastics Technology, the big gain was cycle time, because without a sprue to cool, the part’s own cooling determined how long each shot took. It’s easy to see the appeal now, but in the late ’70s many shops stuck with cold runners anyway, put off by the upfront cost, the extra heat the system added to the tool, and what it demanded of their toolmakers and process techs.

Hot runners do come with costs of their own. They add real expense to the mold, color changes take longer, and if one heater zone fails, the tool may be out of service until it is repaired. For those reasons, cold runners are still the sensible choice on some programs today.

This is where H&H’s own history comes in. In the 1970s, while the shop was still operating as Pre-Met, it developed and patented a hot-runner technology and sold it to a company that is now one of the global leaders in hot runners. Pre-Met didn’t invent the hot runner. It got to the technology before most of the industry had adopted it, and it understood the mechanics well enough to build something patentable and worth buying.

Then the shop kept molding parts, which says a lot about how it has treated new technology ever since.

The Press Gets a Brain, and the Mold Gets a Preview

Late 1970s · Microprocessor Press Controls

Before microprocessors, a press ran on relays, timers, and dials, plus whatever the setup tech remembered from last time. The first microprocessor control on plastics machinery turned up in 1975, on a composites filament winder in Wisconsin, of all things. By 1980, every controls maker claimed one. Five years from novelty to table stakes is quick for this industry.

Process monitoring, decoupled molding, and documented process parameters, all of which come up later in this timeline, depend on a press that can remember a job, and that’s mostly what the microprocessor delivered. Once the settings for a job could be saved and pulled up again, nobody had to set the machine up from scratch on every run, and a second production lot stood a reasonable chance of coming out the same as the first.

1978 · Moldflow

In 1978, Colin Austin founded Moldflow in Melbourne on the idea of predicting how plastic would fill a cavity before anyone made the cavity. Up to that point, toolmakers sized and placed gates and runners from experience, and if they guessed wrong, they found out at first shots, with the steel already cut.

Early simulation results sometimes contradicted what experienced press operators believed. The standard response to a part that wouldn’t fill was to make the runner bigger, but the software often recommended making it smaller. The reason is that forcing melt through a narrower channel shears it, and the heat from that friction lets the plastic flow more easily, which isn’t something anyone would likely deduce from looking at a short shot. Austin has described a Kenner engineer standing up to confirm that switching to smaller runners had solved a stubborn problem on one of the company’s Star Wars toys.

A mold flow study is meant to guide a toolmaker’s judgment, not replace it. H&H offers mold flow analysis today, so those questions get asked of a customer’s design at a stage when a change still costs an email rather than a weld repair.

Sparks, Robots, and a New Name on the Door

1969 to the 1980s · CNC EDM

Cutting tools struggle with hardened tool steel. For a long time, the workaround was to machine the mold while the steel was still soft, heat-treat it afterward, and hope it didn’t move in the process. Electrical discharge machining sidesteps the problem by eroding the steel with controlled sparks. Agie began mass-producing the first numerically controlled wire EDM in 1969, and Charmilles patented coated wire in 1978. Through the 1980s, CNC turned EDM into a standard, repeatable toolroom process that no longer depended on one specialist’s touch.

The version most people picture is wire EDM: sparks, and a brass wire about as thick as a guitar’s high E string working its way through hardened steel. H&H runs sinker EDM, the older of the two, where a shaped electrode is burned into the steel. That’s how a cavity gets sharp internal corners and deep, narrow ribs in places an end mill can’t reach.

1980 · H&H Molds Incorporates

The shop that had been Pre-Met incorporated as H&H Molds, Inc. in 1980, landing right in the middle of this list. Press controls were going digital, Moldflow was two years old, and toolrooms were rebuilding around CNC. A shop incorporating that year inherited the old way and the new way at once and had to decide, piece by piece, which one earned floor space. Some of those calls were easy. Others, like how far to trust a computer’s prediction of how plastic would flow, took the whole industry years to settle.

Late 1970s to 1980s · Takeout Robots and Sprue Pickers

Someone reached into the press. An operator opened the safety gate, pulled the parts and the runner, shut the gate, and the machine waited on that person every cycle, so open time depended on how fast they were moving at hour seven of a shift. Sprue pickers (that cold-runner tree had to go somewhere) and full takeout robots spread through U.S. shops because they removed the variability. A robot pulls the same way every shot, which keeps mold-open time steady, which keeps the steel’s temperature steady, and consistent parts follow.

A Sidebar on the Mold Base Nobody Puts on a Timeline

Undated · Modular Mold Bases

Modular mold bases don’t come with a founding date. Standardized frames spread through toolrooms a little at a time, and although they drew less attention than anything else on this list, they changed tooling costs a lot. The idea is to keep the frame and build only new cavity inserts, so each new part doesn’t need an entire base machined. Our modular mold base breakdown covers when that tradeoff is worth making and when it isn’t.

Electric Presses and the End of the Controlled Crash

1983–85 · All-Electric Presses

On a hydraulic press, motion comes from pumped oil, and many machines of that era kept the pump running even when the screw, clamp, and ejectors were all standing still. An all-electric press instead gives each axis its own servo motor, which draws power only while that axis is moving. The result is a sharp drop in energy use, along with motion that repeats more consistently from shot to shot.

Two companies can fairly claim first. Nissei unveiled the MM-5 in 1983, which Nissei’s company history lists as the world’s first electric servomotor-driven injection molding machine. Yoshiharu Inaba joined Fanuc the same year and was sent to the U.S. to train on hydraulic presses. Eight months after that training, he developed AUTOSHOT, which the Plastics Hall of Fame credits as the world’s first mass-produced all-electric injection molding machine. It reached the market in 1985.

An engineer trained in hydraulics built the machine that started pushing them off the floor. In Japan, nearly every injection press is now all-electric. In the U.S., hydraulic and hybrid presses still hold plenty of ground, especially at higher tonnage.

1985 · RJG and Decoupled Molding

RJG dates to 1985, when Rod Groleau founded it as a molding consulting and training company. Groleau has likened the molding of his early career to a controlled crash. The screw drove forward, the cavity filled and packed in one continuous lunge, and setups got tuned until parts came out right, with little visibility into why.

Under decoupled molding, the screw no longer does everything in one push. For the first part of the shot, the press controls how fast the screw moves instead of how hard it pushes, and it keeps filling that way until the cavity is somewhere around 95 to 98 percent full. Then it switches over to pressure control for the packing and holding that finish the part. With the shot broken up like this, an engineer can adjust, measure, or troubleshoot any one stage in isolation, because a change to one no longer drags the others along.

What lasted longest was a shared vocabulary for describing a process. Once fill and pack are treated as separate variables, a process engineer can define the range of settings that makes a good part, write that window down, and notice when the process starts to drift, usually before it produces bad parts.

Printed Prototypes and the Paper Trail Buyers Now Expect

1986 · Stereolithography

Chuck Hull’s stereolithography patent was issued in 1986, describing a way to build a solid part layer by layer by curing liquid resin with ultraviolet light. Before that, a physical prototype meant machining one or cutting a prototype tool, both slow and expensive enough that plenty of designs went straight to production steel on faith.

Stereolithography is memorable to watch. A laser traces one cross-section onto the surface of the liquid resin, moves on to the next layer, and over time a solid part takes shape in the vat. What made it last was more practical. H&H prints parts before committing to steel for the same reason the industry adopted SLA: the customer can hold the part and check its fit, assembly, and feel while design changes are still fairly cheap. A print does have limits, though. It can’t show how the production resin will behave once it’s molded, such as how much it shrinks or whether it warps, and that’s the question mold flow analysis and DFM review are there to answer.

1987 · ISO 9001

When ISO 9001 was published in 1987, it gave buyers a common way to check whether a supplier’s quality system was written down somewhere or lived only in a few people’s heads. The certificate in the lobby is less important than the work it requires. A certified shop must document how it does its work, show that it follows that documentation, and be audited each year by an outside party. H&H holds ISO 9001:2015 certification through Amtivo, a registrar formerly known as American Systems Registrar.

1993 · PPAP

The Production Part Approval Process came out of the Automotive Industry Action Group in 1993. Its purpose is to answer one question with documented evidence instead of a supplier’s word: can this supplier produce the part to print, at the required rate, on every run? To get production approved, the supplier submits a package that includes dimensional results and material certs along with the process flow, a control plan, and capability studies. Although the process began in the auto industry, it has spread well beyond it, and the teams that use it tend to prefer proof before placing a large order rather than dealing with surprises once the order is in. A part can measure perfectly and still have its submission rejected, and our PPAP article explains why.

Data Files, Value Streams, and a Standard for Clean Air

1995 · SolidWorks

In 1995, SolidWorks brought parametric 3D CAD to the Windows desktop. Its price moved solid modeling out of the realm of expensive workstations and into ordinary engineering departments, and that in turn changed the kind of information molders received from customers. Shops that had been interpreting 2D drawings began getting the part itself as data, so they could measure wall thickness, draft, and rib geometry before writing a quote.

At H&H, every project starts with the customer’s Build-To file, and we do the DFM review on that file. Walls thick enough to sink, ribs likely to stick in the steel, faces with no draft: those get caught on a screen, weeks before anyone is holding a first-article part.

Late 1990s · Lean and Value Stream Mapping

By the late 1990s, ideas from Toyota’s production system had been circulating in the U.S. for years, and value stream mapping, popularized by Mike Rother and John Shook’s 1998 workbook Learning to See, gave plants a practical way to put them to work. The exercise involves walking every step a product takes between raw material and the shipping dock, drawing it out, and marking each place where the product sits and waits. For most products, the time spent waiting far exceeds the time spent working on them.

H&H organizes its floor by value streams, and its Value Stream Managers sit on the leadership team. Putting the people accountable for a product’s flow at the leadership table makes it a lot harder for delays to disappear into handoffs between departments.

1999 · ISO 14644

ISO 14644, published in 1999, gave cleanrooms an international classification based on particle counts, defined as the maximum number of airborne particles at or above a given size permitted in each cubic meter of air. Until then, classes had mostly been set at the national level, so a buyer in one country and a supplier in another could easily be reading from different tables. Paperwork hasn’t entirely caught up with the change. You may find an older spec calling a room Class 100,000 and a newer one describing roughly the same air as ISO 8, so if a drawing still uses the old class, it’s worth confirming which standard the quote is based on.

Why Every Innovation That Stuck Moved Knowledge Earlier

2025–26 · Mold Transfers and Reshoring

After the tariff changes of 2025 and 2026, many buyers took a second look at where their tools are located and what it now costs to run parts there. In many programs, reshoring has looked like moving existing molds to another molder instead of paying for new ones, so the money already sunk into tooling keeps earning its keep. We compare the two costs in the mold transfer piece on our blog: the move is paid for once, while a duty is charged on every shipment.

A transfer also tests everything earlier on this list. A tool that arrives with its Build-To file, process sheet, and qualification records is a fairly short restart, usually inspection, maintenance, and a requalification run. One that arrives as a crate of steel and a sample part is a reverse-engineering project.

Most of the innovations on this list have something in common: each one pushed discovery earlier in a program.

With mold flow, you answer questions while the steel is still uncut. Printed prototypes are checked before any tooling exists, the process window gets established before production, and the approval package is reviewed before the first large order ships.

Controls, robots, and servo-driven presses did a different job. They made the press repeat itself, which kept those early answers true once production was running.

That’s the most practical lesson fifty years of injection molding history offers a buyer. When you evaluate a molder, ask where in their process they catch a bad design.

At the quote? At first shots? On your receiving dock?

Several entries on this timeline run through H&H directly. Back in the 1970s, as Pre-Met, we patented a hot-runner technology. Today our toolroom runs sinker EDM, our engineers put mold flow and printed prototypes ahead of any steel, and the floor is organized around value streams. We got a few of these early. We adopted most once they’d earned the floor space, and we kept molding parts the whole time.

If you’ve got a Build-To file headed for steel or a mold that needs a new home, the H&H contact page is the quickest way to get it in front of the engineering team while the expensive decisions are still open.